| MIL-S-82529(OS
Table 1. Preproduction and Periodic Production Test Sequence (Continued)
Paragraph
Test Quantities
Periodic
Test
Number
Preproduction
4
Vibration, Operating Condition
4.5. 1.4
4
2**
Quality Conformance Inspection 4.6
Shock, Operating Condition
4.5. 1.6
4.5. 1.G.1 2
2
Major
4.5. 1.6,2 2
Minor
Inspection 4.6***
2
2
These switches are expended during quality conformance tests.
***Except for the functioning tests of 4.6.2.3.
4.4 Test Equipment.
4.4.1 Quality conformance inspe ction equipment. The following items of
test equipment are required to perform the quality conformance inspection tests:
Capability
Equipment
O to O. 10 ohm; accuracy 5 percent
a. Low resistance
measuring device
Maintain temperature at plud 75 plus
b. Conditioning chamber
or minus 5 degrees F and a relative
humidity of 75 plus or minus 5 per-
cent.
0,00 to 100 megohms; accuracy 10
c. Megohmmeter
percent at 20 and 100 megohms with
500 plus or minus 50 volts DC
potential
Maintain temperature at 165 plus
d. Temperature chamber
O minus 5 degrees F.
|