|
| MIL-S-85419(AS)
Paragraph
Page
Paragraph Title
No.
No.
4.5.3
34
Surface Temperature
Leakage
4.5.4
34
34
Shock Tests
4.5.5
Vibration
4.5.6
34
34
4.5.6.1
Method
4.5.6.2
34
Procedure
4.5.6.2.1
Test Installation
34
4.5.6.2.2
Resonance Survey
35
35
4.5.6.2.3
Resonance Endurance Tests
4.5.6.2.4
35
Cycling Endurance Test
36
4.5.6.3
Electrical Controls Random
Endurance Test
4.5.7
36
Start Cycle Abort
4.5.8
36
Running Engagement
36
4.5.9
Teardown Inspection
37
4.5.10
Containment
4.5.10.1
37
Uncontrolled Overspeed Power
Output Section
4.5.10.2
37
Uncontrolled Overspeed Gas
Generator Section
4.5.10.3
37
Overrunning Clutch Failure
4.5.11
37
Initiator Running Engagement
4.5.12
37
Initiator Torque Limiting
4.5.13
37
Initiator Engaging Clutch
4.5.14
38
Humidity
63
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |