Click here to make tpub.com your Home Page

Page Title: Table II. Qualification inspection group submission. 1/
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
.
MIL-S-8805/50D
Qualification:
Group submission: See table II.
Conformance:
Group B inspection: Not applicable.
Part or Identifying Number (PIN): See table III.
TABLE II. Qualification inspection group submission. 1/
Examination
Basic
Other switch
Extent of
or test
switch
samples
approval
Qualification inspection
MS25040-2, and 4:
table of MIL-PRF-8805,
Two sample units each,
groups I, II, III, V,
MS25040-1
visual and mechanical
ALL
VI, VII, and VIII
examination
TABLE III. Part or Identifying Number (PIN). 1/
PIN
Contact arrangement
MS25040-1
2 circuit
MS25040-2
SPDT
MS25040-3
4 circuit
MS25040-4
DPDT
1/ Military Standard Drawing MS25040 is canceled and superceded by MIL-S-8805/50.
Referenced documents. In addition to MIL-PRF-8805, this document references the following:
MIL-STD-202
AN3054
Marginal notations are not used in this revision to identify changes with respect to the previous issue due
to the extent of the changes.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force 11
(Project 5930-2006-020)
DLA - CC
Review activities:
Army AR, GL, MI
Navy AS, MC, OS, SH
Air Force 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change, you should verify the currency of the information
above using the ASSIST Online database at http://assist.daps.dla.mil/
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business