Click here to make tpub.com your Home Page

Page Title: Certification data
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-15108C(NAVY)
(j)
Outline with cut-away half sections and essential details of the
equipment.  Front and side views shall be shown.  The top view
shall also be shown, if necessary, for understanding the drawing.
The center-of-gravity shall be shown and dimensioned.
(k)
Elementary wiring diagram showing lead markings.
(1)
Table of design performance data with corresponding groups, primary
no-load voltage, primary rated amperes, secondary no-load voltage,
secondary rated amperes, no-load watts loss, total watts loss,
regulation at 1.0 power factor (pf), regulation at 0.8 pf, percent
exciting current, percent impedance, maximum peak inrush current,
turns ratio, and voltage ratio.
(m)
Table of winding data with corresponding group number, winding, volts,
number of coils, turns, turns per layers, layers, length of layer,
dimensions of bare conductor, area of conductor, dimensions of insulated
conductor, applicable specification of conductor, weight of conductor,
and resistance of winding.
(n)
Diagram of connections for three-phase operation.
(o)
Cut-away pictorial view of wiring compartment showing method of con-
necting leads to ship's cable.
(p)
Details of cable support bracket or terminal board, where used,
showing dimensions.
(q)
The title block shall include, in addition to the title, kVA, Hz,
phases, temperature rise, and insulation system.
(r)
Drawings shall be submitted to NAVSEC and certification data to the
procuring activity.
3.30.2 Certification data.  In addition to the certification data sheet content required
#
by the data ordering document, the following unique features shall be included:
Transformer.
(a)
KVA ratio.
(b)
Primary volts.
(c)
Secondary volts.
(d)
Frequency.
(e)
Insulation system class.
(f)
Class shock.
(g)
Single-phase.
(h)
Weight.
(i)
National stock number.
(j)
Maximum ambient temperature.
(k)
Maximum temperature rise in `C.
(1)
3.31 Workmanship
Material, workmanship, and design of each transformer shall be in
#
accordance with this specification.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.  Unless otherwise specified in the contract or
#
purchase order, the supplier is responsible for the performance of all inspection requirements
as specified herein.  Except as otherwise specified in the contract or order, the supplier
may use his own or any other facilities suitable for the performance of the inspection re-
quirements specified herein, unless disapproved by the Government. The Government reserves
the right to perform any of the inspections set forth in the specification where' such
inspections are deemed necessary to assure supplies and services conform to prescribed re-
quirements.
4.1.1 Inspection system. The supplier shall provide and maintain an inspection
#
system in accordance with the data ordering documents included in the contract or order
(see 6.2.2).
The examination and testing shall be classified as
4.2 Classification of inspection.
#
follows:
(a) Qualification tests (see 4.3).
(b) Quality conformance inspection (see
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business