|
| MIL-T-18232B(AS)
7.
(Cont)
PARAGRAPH
3.1.18.2
Operational
3.2.18
Operation, extreme temperature
2.1.1
Other specifications
3.7.2.1.1
Parachute
6.1.1.2
Paragraphs, specification
3.l.24.2
Parts$ marking of
3.1.2
Performance
3.1.2.1
Guaranteed performance
3.1.2.2
specific fuel consumption
3.1.27
Physical references
3.1.20.15
Pins
3.1.20.15.1
Spring pins
3.10.9.2.8
Pipes, breather
3.10.10.3
Pipng and fittings (fuel)
3.1.20.7
Plastics, reinforced
3.12.2
Pneumatic system
3.32.1
Description
3.12.2.2
Summary of actuated items
3.13.3
Power conversion (electrical)
6.4.1.3
Power provision
3.13.2
Power supply (electrical)
3.13.4
Power utilization, electrical
3.1.1l
Preclusion of hazards from electromagnetiic radiation
Preparation for delivery
5
6.1
Preparation of detail and type specifications
Preservation and packaging
Primer and starter controls
Priming system (reciprocating]
Production:
3.1.20.1
Ball and socket joints
3.1.12
Clearance for loose articles
3.1.12
Corrosion
3.1.12
General
3.1.12
Producibility
3.10.13
Propeller
3.10.13.4
Clearance
3.10.13.1
Components
3.10.13.3
Finish
3.10.13.2
Types
59
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |