|
| MIL-T-21369C(OS)
(3) Set the TEST SELECTOR switch at 3. In about 5 seconds the panel lamp indicated
by the previous step (P11 for Step 1) shall be extinguished and the panel lamp listed for the
ax-responding step and no other lamp shall light- The VOLTAGE and LEAKAGE meter shall
indicate 46 1 scale divisions.
j. Depress and hold the ADVANCE switch until the HOME lamp lights.
k. Disconnect the 5-megohm resistor from pin N of the 19-pin connector and connect it to pin
C of the 3-pin ADAPTER CABLES connector.
L Set the TEST SELECTOR switch at 4.
m. Momentarily depress the START switch. The VOLTAGE and LEAKAGE meter shall
indicate 46 1 scale divisions.
n. Set the TEST SELECTOR switch at 3.
0. Disconnect the 5-megohm resistor.
TABLE II. Panel lamp connection.s.
step
Panel Lamp
Adapter Cable Connector Pin
1
19-pin
B
2
2
C
19-pin
3
3
D
4
19-pin
4
E
19-pin
5
5
6
19-pin
F
7
19-pin
6
G
7
8
14-pin
A
8
14-pin
B
9
9
C
14-pin
10
N
19-pin
10
11
4.8.2.42 50 megohms. Immediately following the test of 4.8.2.4.1, procedures 4.8.2.4.2a through
4.8.2.4.2f shall be performed in sequence.
a. Set the 5 Meg-50 Meg switch at 50 Meg.
b. Connect the 50-megohm resistor specified by 4.7g between pin B of the TEST STAND
connector and pin C of the 3-pin ADAPTER CABLES connector
c. Set the TEST SELECTOR switch at 4.
19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |