(b) Diagrams of test setups.
(c) Reproducible outline and description of tests and test
conditions. Where tests specified in this specification
are not considered applicable, the reason, and the sub-
stituted test should be clearly described.
(d)
Copies of test log sheets.
(e) Photographs when available.
Drawings and data list - Drawings, engineering and associated
6.3.2
lists of the test equipment shall be in accordance with MIL-D-70327 (Drawings,
Engineering and Associated Lists).
6.3.3
Verification data - A report shall be submitted verifying that
components have met the following design, test, calibration, and performance re-
quirements specified in Section 3:
(a) Reservoir internal pressure test (see 3.4.3.1.3)
(b) Braided hose and coupling electrical resistance (see
3.4.3.5.1.1)
(c) Heat exchanger maximum operating pressure test (see
3.4.3.7.2.1)
(d) Warm-up test (see 3.4.3.7.2.2 or 3.4.3.7.2.3)
(e) Warm-up time (see 3.4.3.7.2.2.1 or 3.4.3.7.2.3.1)
Heat exchanger flow (see 3.4.3.7.2.3)
(f)
(g) Relief valves (see 3.4.3.8.1)
(h) Fuel flowmeter accuracy (see 3.4.4.1.2)
(i)
Flowmeter leak test (see 3.4.4.1.3)
Flowmeter pressure drop (see 3.4.4.1.4)
(j)
Hydraulic and lubricating oil flowmeter
(k)
accuracy (see 3.4.4.2)
31
|