Click here to make tpub.com your Home Page

Page Title: Final acceptance inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-46385A(MU)
4.3.2.2 Final acceptance inspection. - Subsequent to first article
approval, examination and tests related to Section 3 herein shall be
performed on a single defect (individual characteristic) basis in accordance
with MIL-STD-105 and the sampling plans specified in Table II herein.
Examination and tests for Packaging, Packing and Marking shall be in
accordance with MIL-P-14232 and Section 5 herein. The tabulated classifica-
tion of defects in Table II shall constitute the minimum inspection to be
performed by the supplier after first article approval and prior to Govern-
ment acceptance or rejection by item or lot.
TABLE II - CLASSIFICATION OF DEFECTS
4.3.3 Acceptance and rejection. - Rejected lots shall be screened for
all defective characteristics. Removal or correctionof defective units
and resubmittance of rejected lots shall be in accordance with "Acceptance
and Rejection" as specified in MIL-STD-105.
4.4 Special sampling.
4.4.1 General. - Three telescopes shall be selected at random as a
special sampling from each 100 produced. The sample shall meet the re-
quirements and tests in Table III.
6.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business