Click here to make tpub.com your Home Page

Page Title: Components
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-46591B
been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or
methods of manufacture are specified on the drawings, the bidder's selections shall be clearly stated in the
proposal.
3.2 Components.
3.2.1 Primary components. For the purpose of this specification, the M94 impulse cartridge (Drawing
8596708) is defined as a primary component. Only primary components from a single lot shall be used in a
production lot of thrusters; however, one primary component production lot may be used in more than one
thruster production lot.
3.2.2 Component parts. All component parts shall meet the applicable requirements of MIL-T-46590
or MIL-T-60694 prior to assembly.
3.3 Torque. Torque requirements shall be as specified in table I. No movement shall occur upon
application of the breakaway torque.
TABLE I. Torque requirements.
A
B
Components
Seating or bottoming
Breakaway, min
(inch pounds)
(inch pounds)
Firing pin housing and body
600 + 30
400
3.4 Residual magnetism. The thruster shall not deflect the indicator of the compass more than five
degrees in either direction (see 4.3.2).
3.5 Radiographic examination. Each thruster assembly shall be radiographically examined for defects
(see 4.3.3).
3.7 Functional.
3.7.1 Load. The thruster, fired under load, shall perform as follows (see 6.3).
3.7.2 Thrust. With the piston rod connected to an 11-pound mass, the thruster shall deliver sufficient
thrust to shear a 3750-pound shear pin located at zero inches stroke and simultaneously overcome a 2250-
pound resistive load from zero inches stroke to completion of stroke.
3.7.3 Stroke. Complete a stroke of 4.42 inches, minimum.
3.7.4 Operating time. Time between initiation of cartridge to completion of stroke shall not be less than
750 milliseconds.
3.7.5 After load firing.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business