4.2.3.1.1 Firing pin housing and body. Each firing pin housing and body assembly shall be subjected
to a breakaway torque. Failure of any subassembly to comply with the requirements of 3.3 and table I shall
be cause for rejection of the assembly.
4.2.3.2 Residual magnetism. Each assembly shall be subjected to the test for excessive residual
magnetism as specified in 4.3.2. Failure of any unit to comply with 3.4 shall be cause for rejection of the
assembly.
4.2.3.3 Functional tests. The following tests shall be performed by the Government.
4.2.3.3.1 Ballistics. Twenty-one units shall be tested to determine compliance with 3.7. The units shall
be temperature conditioned as provided in table II and 4.3.4.2. Failure of any unit to comply with 3.7.1
through 3.7.9 shall be cause for rejection of the lot.
TABLE II. Conditioning temperature.
Sample size
Method
Temperature (F)
7
Load (see 3.7.1)
65 to 70
7
Load (see 3.7.1)
65 to 75
7
Load (see 3.7.1)
195 to 205
4.2.3.3.2 Retest. There shall be no retests.
4.2.3.3.3 Test failure. If a test failure is attributable to an assignable cause, excluding the test thruster,
the original test results shall be discarded and that test reconducted.
4.3 Test methods and procedures.
4.3.1 Breakaway torque. A torque wrench, set at the torque requirements specified in table I, shall be
used with an appropriate adapter to determine the adequacy of the joint. The torque shall be applied to the
firing pin housing.
4.3.2 Residual magnetism. The assembly shall be tested for excessive residual magnetism using an
approved compass in an area free of local magnetic effects by placing the assembly 5 inches from the end at
the same height as the compass, in the north-south horizontal position (head end at south) with the compass
set in an east-west heading. The assembly shall be moved at a speed no greater than 10 feet per minute past
the compass for its entire length, rotated 90 degrees in the horizontal position about its longitudinal axis, and
moved slowly back past the compass. This procedure shall be repeated for each 90 degree rotation of the
assembly for four full passes.
4.3.3 Radiographic examination. All assembled thrusters shall be radiographically examined in
accordance with MIL-STD-453, with the exception that an thruster assembly will be used for the penetrameter.
Any observable imperfections in components or assembly shall be cause for rejection. The thrusters shall be
positioned for the most revealing exposure, with the long axis of each assembly perpendicular to the rays of
the X-ray machine. All thrusters shall be identified with serial numbers prior to X-ray examination. The serial