Click here to make tpub.com your Home Page

Page Title: Box, Fiberboard (Outer), Alternative, Packing, Ammunition, Drawing 9217388
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-46605B
Critical
None defined
Major
None defined
Minor
201
Contents loose
Visual/Manual
202
Strapping missing, loose, broken, or improperly assembled
Visual/Manual
203
Contents of box exposed
Visual
204
Box damaged
Visual
205
Marking missing, incorrect, or illegible
Visual
206
Number of units incorrect
Visual
4.5.2.17 Box, Fiberboard (Outer), Alternative, Packing, Ammunition, Drawing 9217388.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual/Visual
202
Carton broken or damaged
Visual
203
Number of units incorrect
Visual
204
Marking missing, incorrect, or illegible
Visual
205
Tape incomplete
Visual
4.5.3 Inspection testing. The following tests shall be performed in accordance with 4.6.
4.5.3.1 Hardness. Fifty units from each heat treated lot of components shall be tested for compliance
with the requirements on the applicable drawing. Failure of any unit to comply with the drawing requirements
shall be cause for rejection of the lot of components.
4.5.3.2 Hydrostatic pressure. Each body shall be subjected to the hydrostatic pressure test. Failure of
any unit to comply with 3.4 shall be cause for rejection of the subassembly.
4.5.3.3 Breakaway torque. Each piston fastener and piston shall be subjected to a breakaway torque test.
Failure to comply with the requirements of column C of table I shall be cause for rejection of the unit.
4.5.3.4 Shear pin strength. Fifty pins from each lot of shear pins shall be tested for shear strength.
Failure of any shear pin to comply with 3.6 shall be cause for rejection of the lot.
4.5.3.5 Protective finish. The number of units for protective finish tests shall be in accordance with the
applicable specification. Failure of any unit in the inspection sample to comply with the requirements of the
applicable specification shall be cause for rejection of the lot.
15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business