Click here to make tpub.com your Home Page

Page Title: In-process inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-46780D(AT)
8736775
- Supplementary Quality Assurance Provisions for Truck, Tank:
Water 1000 Gallon, 2 1/2 Ton, 6X6, M50A3 WO/Winch.
8736597
- Supplementary Quality Assurance Provisions for Truck Tractor:
2 1/2 Ton, 6X6 M275A2, W/Winch.
8736598
- Supplementary Quality Assurance Provisions for Truck Dump:
2 1/2 Ton 6X6, M342A2, WO/Winch.
8736600
- Supplementary Quality Assurance Provisions for Repair Shop
Truck Mounted: 2 1/2 Ton, 6X6, M185A3, WO/Winch.
8736601
- Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2, WO/Winch.
8736602
- Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2G , WO/Winch.
8736603
- Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M46A2C, W/Winch.
8736604
- Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2G, W/Winch.
8736733
- Supplementary Quality Assurance Provisions for Truck, Cargo:
Drop Side, 2 1/2 Ton, 6X6 M35A2C, WO/Winch.
8736735
- Supplementary Quality Assurance Provisions for Truck, Cargo:
Drop Side, 2 1/2 Ton, 6X6, M35A2C W/Winch.
8736769
- Supplementary Quality Assurance Provisions for Truck
Maintenance, Pipeline Construction, 2 1/2 Ton, 6X6, M756A2
W/Winch.
8736782
- Supplementary Quality Assurance Provisions for Truck,
Maintenance, Earth Borer, Pole Sitter, 2 1/2 Ton 6X6, M764,
W/Winch.
4.1.5 In-process inspection.
4.1.5.1 In-process inspection. During fabrication of the first production vehicle of each
model, an in-process inspection will be conducted by Government representatives (see 3.1) to
evaluate conformance of materials and workmanship with drawing and specification
requirements. These inspections shall be made at the contractor's or sub-contractor's facility
prior to the application of primer or paint.
4.1.5.2 Review and evaluation. Review and evaluation of records for processing
procedure, inspection systems and plan of quality control, will be conducted on the following:
material, welding, surface hardening, heat treating, protective finishes, etc.
4.1.5.3 Complete vehicle inspection. The first vehicle of each model, when complete
shall be inspection by the Government, subsequent to contractor's inspection at the acceptance
inspection location specified in contract, to determine conformance to contract and specification
requirements.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business