Click here to make tpub.com your Home Page

Page Title: Special kits operational tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-46780D(AT)
4.3.3.2 Special kits operational tests. To determine conformance to 3.3.1 through
3.3.1.7, a specific kit when furnished with a vehicle or subsequent to arrival of vehicle for testing
the kit shall be installed on vehicle and checked for operational requirements.
4.3.3.3 Water-tank trucks, capacity, and tire chain clearance check. To determine
conformance to 3.3.8, the tank shall be filled to capacity and vehicle operated as specified, and
checked for capacity requirements and tire chain clearance.
4.3.3.4 Equipment cabinet test. To determine conformance to 3.3.8.3, the equipment
shall be stowed as specified and vehicle operated cross country as specified in table XII, and
equipment checked for damage.
4.3.3.5 Heating chamber check. To determine conformance to 3.3.8.6, during this test
the heat shall be put through the chambers, the two-way valve and control operated, exhaust-gas
outlet checked for exhaust escape, and heat chamber function.
4.3.3.6 Environmental operational tests. To determine conformance to 3.4.1, the vehicle,
properly serviced and equipped shall be subjected to the applicable tests in high and low
temperatures.
4.3.3.7 Vehicle loading tests. To determine conformance to 3.4.2, the specific vehicle
furnished for this test shall be loaded as specified (see 6.6, Table XIV).
4.3.3.8 Vehicle operational test. To determine conformance to 3.4.3, through 3.4.5.2,
vehicle shall be loaded to GVW, operated as specified and checked for cross country, highway
performance, and cooling system requirements.
4.3.3.9 Water fording test. To determine conformance to 3.4.6 the vehicle shall be
operated in water of a minimum of 30 inches in depth for at least 15 minutes. While vehicle is
submerged shut the engine down for a minimum of one minute and restart. Immediately
following the fording test, vehicle shall be examined for evidence of water leaks. Remove all
wheels and hubs and examine bearing areas for evidence of water, drain the oil from the
differentials, transmission and transfer cases and examine for evidence of contamination by
water. Any evidence of contamination by water shall be cause for rejection of the vehicle.
4.3.3.10 Grade and side slope tests. To determine conformance to 3.4.7 through 3.4.7.2,
the vehicle shall be operated on specified grades, slopes, and checked for performance
requirements.
4.3.3.11 Service and parking brake test. To determine conformance to 3.4.8 through
3.4.8.2, the vehicle shall be operated on level roadway and specified grades, and the braking
systems checked for operational requirements.
41

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business