Click here to make tpub.com your Home Page

Page Title: Connector, male
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-48236 (MU)
NOTE 2. - In establishing a curing times, dimensionally check
ten ( 10) parts from each cavity at periodic intervals (e.g.
every 30, 60, etc. mins.) until dimensional stability is
attained.  The curing time will be from the time the part
comes out of the mold until dimensional stability is attained.
The inspection data used in determining the curing time shall
be sent to Picatinny Arsenal, Dover, New Jersey 07801 ATTN:
SARPA-QA-A-M.  If any new change in material, cycle time, a
reworked cavity, or a new cavity is used, a new curing time
shall be established and approved.
4.3.5.1 Connector, male (see dwg. 9272095 covering a detail
of dwg. 9272546).
Code No.
Method of
Defects
Categories
Inspection
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business