Click here to make tpub.com your Home Page

Page Title: Other Government documents, drawings, and publications
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-50356A
(Unless otherwise indicated, copies of federal and military specifications and standards are
available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia,
PA 19111-5094.)
2.1.2 Other Government documents, drawings, and publications. The following Government
drawings form a part of this specification to the extent specified herein. Unless otherwise
specified, the issues are those cited in the solicitation (see 6.2).
DRAWINGS
Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203)
8593855
Thruster, Cartridge Actuated, M1A2, Metal Parts Assembly
8797631
Box, Fiberboard (Inner), Packing, Ammunition, For Thruster, Cartridge
Actuated, M1A2
8797632
Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M1A2
9221261
Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster,
Cartridge Actuated, M1A2
U.S. Air Force
TPO 00-891-5488 Thruster, Cartridge Actuated, M1A2
(Applicationfor copies should be addressed to: Commander, Indian Head Division, Naval Surface
Warfare Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.)
2.2 Order of precedence. In the event of a conflict between the text of this document and the
references cited herein, the text of this document takes precedence. Nothing in this document,
however, supersedes applicable laws and regulations unless a specific exemption has been
obtained.
3. REQUIREMENTS
3.1 Materials. All materials used in the manufacture of the thrusters shall conform to the
specifications referred to on the respective drawings unless specific approval in writing
covering a departure therefrom has been obtained from the cognizant Navy design activity prior to
manufacture. When alternate materials or methods of manufacture are specified on the drawings,
the bidder's selections shall be clearly stated in the proposal. The remanufactured thruster
metal parts assembly shall contain a new shear pin, new O-rings, and a new piston locking spring.
3.2 Hydrostatic pressure. The body and head shall withstand a hydrostatic pressure of 7,500
pounds per square inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical
failure (see 6.3.1).
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business