Click here to make tpub.com your Home Page

Page Title: Acceptance and reflection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-50782(MU)
TEST PROCEDURE
REQUIREMENT
CHRACTERISTIC
4.7.2.1.5
3.7.3
Parallism of image and reticle
106.
4.7.2.1.6
3.7.4
Eyepiece focus
107.
4.7.2.1.7
3.7.5
Parallax
108.
4.7.2.1.8
3.7.7
Reticle accuracy
109.
4.7.2.4
3.7.8
Image wander
110.
4.7.2.2.1
3.8.3.3.2
Settings counter gunner's aid
111.
4.7.2.2.1
3.8.3.3.1
Counter excursion range
112.
4.7.2.2.2
3.8.2.1
Azimuth error (800 roils)
113.
4.7.2.2.2
3.8.2.2
Azimuth deflection error (15 mils)
114.
4.7.2.2.2
3.8.2.3
Azimuth backlash
115.
4.7.2.2.3
3.8.2.4
Level travel
116.
4.7.2.2.4
3.8.2.5
Lift
117.
4.7.2.2.5
3.8.2.6
Click mechanism
118.
4.7.2.2.6
3.8.3.1
Rapid traverse (reset counter)
119.
4.7.2.2.6
3.8.3.2
Reset counter (reset operation)
120.
4.7.2.3.1
3.8.1.1
Elevation travel
121.
4.7.2.3.1
3.8.1.2
Plumb travel
122.
4.7.2.3.1
3.8.1.3
Side play
123.
4.7.2.2.7
3.7.6
Resolution
124.
4.7.2.4.1
3.9.1
Torque (7318F)
125.
4.7.2.5
3.9
Operability (7318F)
126.
4.7.2.6
3.10.2
Illumination (reticle)
127.
4.7.2.6
3.10.1
Illumination (counters)
128.
4.7.2.7
3.9.2.3
Counter number alignment
129.
4.7.2.8
3.9.2.1
Elbow movement force (7318F)
130.
4.7.2.9
3.9.2.2
Reset counter force (7318F)
131.
4.7.2.10
3.11
Insulation resistance
132.
4.7.2.11
3.12
Continuity
133.
4.3.3 Acceptance and reflection. - Rejected lots shall be screened
for all defective characteristics. Removal or correction of defective
units and resubmittance of rejected lots shall be in accordance with
"Acceptance and Rejection" as specified in MIL-STD-105.
4.4 Special sampling for environmental testing.
4.4.1 Samples shall be selected form lots at random using inspection
level S-3 Table I of MLL-STD-105. Acceptance or rejection of the lot
shall be in accordance with AQL 2.5 of Table II-A of MIL-STD-105. The
samples shall have met all the requirements and tests outlined in Table I
prior to being subjected to the following examination and test. The
requirements outlined in 3. 1 and 3.2 shall be accepted on contractor's
certification.
TABLE II
REQUIREMENT
TEST PROCEDURE
CHARACTERISTIC
3.3.1
4.6.1.1
301. Temperature (storage)
3.3.2
4.6.1.1
302. Temperature (operating)
3.9
303.  Operability (operating temperature)
4.7.2.5
9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business