Click here to make tpub.com your Home Page

Page Title: Fiberglass fabrication
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-52843C
of the member, and shall be in accordance with SAE J492 or IFI
Standard No. 114 for Break Mandrel Blind Rivets.
3.37.6 Machine work. Tolerances and gages for metal fits shall
conform to the limits specified herein and to the standards of the
Materials Handling Equipment Industry or the Construction Equipment
Industry.
3.37.7 Fiberglass fabrication. Fiberglass reinforced plastic (FRP)
and FRP coated plywood bodies shall be smooth surfaced and free from
bubbles, glazing cracks, and discontinuities and shall have a uniform
FRP thickness. All edges and openings of FRP coated plywood shall be
completely sealed to prevent water intrusion between the laminates.
The FRP shall be free of parting agents which impair paint adhesion.
Welding, bonding, connections, and fabrication of the FRP shall be in
accordance with the recommended methods of the manufacturer of the
material for this application.
3.38 Nuclear-biological-chemical (NBC) protection The forklift
.
shall be operable by personnel wearing the following complete
protective ensemble:
a.
Chemical-biological
mask, MIL-M-51282.
b.
Chemical-biological
hood, MIL-H-51291.
c.
Chemical protective
suit, MIL-S-43926.
d.
Chemical protective
glove set, MIL-G-43976.
e.
Chemical protective
footwear, MIL-F-43987.
The operator shall be capable of actuating all controls (i.e.,
levers, switches, pedals, knobs, and handles) without interference
caused by the ensemble that is detrimental to the operation of the
forklift. The forklift shall complete two cycles in 9 minutes or less
on the load placement course as specified in 4.6.2.40. The protective
ensemble, as listed above, will be loaned as Government loaned
equipment in order to permit performance of the tests required under
test method No. 34.
3.38.1 High altitude electromagnetic pulse (EMP) Schematic and
.
electrical diagrams detailed to the component level (i.e., resistors,
capacitors, filters, transistors, SCR's) with value of all
components, of the forklift shall be furnished by the contractor to
the Government to assist the Government in performing the EMP
evaluation. When specified (see 6.2), a forklift shall be furnished
to the Government and shall be evaluated by the Government to
determine necessary protection devices for protection against EMP.
3.39 Vehicle weight classification sign kit The contractor shall
.
apply the Government furnished vehicle weight classification numbers
to each vehicle utilizing a vehicle weight classification number kit
conforming to MIL-S-40626. The kit shall be located on the front of
the vehicle in a location approved by the contracting officer. The
43

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business