Click here to make tpub.com your Home Page

Page Title: Inspection of packaging
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-60561B
moved slowly back past the compass. This procedure shall be repeated for each 90 degree rotation of the
assembly for four full passes.
4.7 Inspection of packaging. The sampling and inspection of the packaging, packing, and container
marking shall be in accordance with the requirements of section 5.
5. PACKAGING
5.1 Packing and marking. Packing and marking shall be Level A or B, as specified by the contracting
activity (see 6.2). Level A shall be in accordance with Drawings 8797741 and 8797742. Level B shall be in
accordance with Drawings 8797741 and 9217579.
5.2 Air Force packaging. Air Force packaging shall be in accordance with TPO 00-554-3103.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful but is not
mandatory.)
6.1 Intended use. The thruster assembly is used in conjunction with other propellant actuated devices
in Aircrew Emergency Escape Systems.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification
b. Issue of DODISS to be cited in the solicitation and, if required, the specific issue of individual
documents referenced (see 2.1.1 and 2.1.2)
c. If first article inspection is required (see 3.1 and 6.3)
d. The responsible inspection activity (see 4.1)
e. Any special instruction requirements (see 4.3)
f. Level of packing and marking (see 5.1)
6.3 First article. When a first article inspection is required, the contracting officer should provide
specific guidance to offerors that the items should be a first article sample. The first article should consist of
5 metal parts assemblies, 9 sets of unassembled parts, 1 set of unassembled parts without plating or final
protective finish, and 50 shear pins. The contracting officer should also include specific instructions in
acquisition documents regarding arrangements for examination, approval of first article test results, and
disposition of first articles. Invitations for bids should provide that the Government reserves the right to waive
the requirement for samples for first article inspection to those bidders offering a product which has been
previously acquired or tested by the Government, and that bidders offering such products, who wish to rely
on such production or test, must furnish evidence with the bid that prior Government approval is presently
appropriate for the pending contract. Bidders should not submit alternate bids unless specifically requested
to do so in the solicitation.
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business