Click here to make tpub.com your Home Page

Page Title: First article (initial Production) approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-60895(MU)
4.2 First article (initial Production) approval. - The requirement for
first article approval and the responsibility (Government or contractor) for
first article testing shall be as specified in the contract. The sample
for first article approval tests shall consist of three (3) telescopes plus
three (3) each of all items covered by SQAP. The sample shall be manufavture
in the same manner, using the same materials, equipment, processes, and
procedures as used in regular production. All parts and materials, including
packaging and packing, shall be obtained from the same source of supply as
used in regular production.
4.2.1 Government testing. - When the Government is responsible for
conducting first article approval tests, the contractor, prior to submitting
the sample to the Government, shall inspect the sample to insure that it
conforms to all the requirements of the contract and submit a record of this
inspection with the sample, including certificates of conformance for materials.
4.2.2 Contractoir testing. - When the contractor is responsible for con-
ducting first article approval tests, the sample shall be inspected by the
contractor for all the requirements of the contract. The sample and a
record of this inspection, including certificates of conformance for materials,
shall be submitted to the Government for approval. The overnmetn reserves
the right to witness the contractor's inspection.
4.3 Inspection provisions.
4.3.1 Submission of Product. - Unless otherwise specified by the con-
tracting officer, inspection lot size, lot formation and presentation of lots
shall be in accordance with "Submission of Product" provisions of MIL-STD-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies. - All components and subassemblies
shall be inspected in accordance with the inspection provisions contained in
Supplementary Quality Assurance Provisions (SQAP) listed in the List of Inspec-
tion Documents (IEL), when provided with the technical data package (TDP).
In the avsence of SQAP's, the applicable Quality Assurance Provisions of
MIL-F-13926 shall apply.
4.3.2.2 Final acceptance inspection. - Subsequent to first article
approval, approval, examination and tests related to Section 3 herein shall be per-
formed on a single defect (individual characteristic) basis in accordance
with MIL-STD-105 and the sampling plans specified in Table I herein.
Examination and tests for Packaging, Packing and Marking shall be in
accordance with MIL-P-14232 and Section 5 herein. The tabulated classifi-
cation of defects in Table I shall constitute the minimum inspection to be
performed by the supplier after first article approval and prior to Govern-
ment acceptance or rejection by item or lot.
TABLE I CLASSIFICATION OF DEFECTS
TEST PROCEDURE
REQUIREMENT
CHARACTERISTIC
CLASS
CRITICAL:  100% Inspection
4.6.1.2
3.4.1
1.
Pressure (optical assembly)
4.6.1.2.1
3.4.2
2.
Pressure (counter assembly)
7.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business