Click here to make tpub.com your Home Page

Page Title: Submission for inspection equipment design for approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-63531(AR)
e. First Article sample requirements, if other than
specified in section 4 of this specification.
f. Packaging requirements, if other than specified in
Section 5 of this specification.
g. Certificates of conformance for each lot or shipment
of product.
6.2.2 Contract data requirements. Contract data requirements
for inspection equipment design shall conform to Data Item
Description DI-R-1714, Tailored.
6.3 Submission for inspection equipment design for approval.
See MIL-W-63520. Equipment designs shall be submitted as required
to: Commander, ARRADCOM, ATTN: DRDAR-QAF, Dover, NJ 07801.
Request letter of submittal shall state contractor, contract
number, specification number, item nomenclature, and classification
of defects and test paragraphs.
6.4 Submission of results of contractor-conducted examinations
and tests. Unless otherwise specified by the Contracting Officer,
the contractor shall forward requested records of examinations or
tests to: Commander, ARRADCOM, ATTN: DRDAR-QAF-S, Dover, NJ
07801.
Preparing activity:
Custodian:
ArmY-AR
Army-AR
(project 1OO5-A613)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business