4.6.2.1 Temperature. A high temperature test shall be performed in
accordance with MIL-STD-81O, Method 501.1. Procedure H, and a low temperature
test shall be performed in accordance with MIL-STD-810, Method 502.1, Procedure
I. The minimum temperature during the low temperature test shall be -65F,
and the maximum temperature during the high temperature test shall be +160C.
4.6.2.2 Altitude. A low pressure altitude test shaLl be performed in
accordance with MIL-STD-810, Method 500.1, Procedure I.
4.6.2.3 Temperature - altitude combination. A temperature - altitude
test shall be performed in accordance with MIL-STD-810C, Method 504.1,
Procedure I and equipment category 5.
4.6.2.4 Humidity. A humidity test shall be performed in accordance with
MIL-STD-81O, 507.1, Procedure I.
4.6.2.5 Vibration. A vibration test shall be performed in accordance
with MIL-STD-810, Method 514.2, Procedure I, Equipment Category C, except use
0.3 inch double Amplitude from 5 to 40 cps or 3 g acceleration, whichever is
-
less, and use 0.036 inch double amplitude from 40 cps to 73 cps and 10 g from
73 Cps to 500 Cps.
4.6.2.6 Shock. A shock test shall be performed in accordance with
MIL-STD-810, Method 516.2, Procedure I.
4.6.2.7 Sand and dust. A dust test shall be performed in accordance with
MIL-STD-810, Method 510.1, Procedure I.
4.6.2.8 Fungus. A fungus test shall be performed in accordance with
MIL-STD-810, 508.1, Procedure I.
4.6.2.9 Salt spray test. Samples shall be selected from each protective
o finished lot and subject to the salt spray test in accordance with the
procedures specified-in ASTM B 117. Unless otherwise specified on the
applicable drawing, the minimum exposure time shall be one and one half (1
1/2) hours using a 5% sodium chloride solution. Rejection shall be in
accordance with the applicable protective finish specification.
4.6.3 Electronic performance inspection methods and procedures. The
logic control assembly shall be tested for compliance with specified
electronic, test points, feed-through winding, power outputs, input/output
relationships, adjustments, fire voltage output load, and power supply fail
safe. Any assembly which fails to comply with the specified performance
characteristic requirements or evidences degradation of its operational
performance shall be classed defective. Test equipment and procedures shall
be satisfactory to the contracting officer.