|
| MIL-T-6396E
6.4 Definitions. For purposes of this specification, the following
definitions are applicable.
6.4.1 Contractor.
This term refers to the aircraft contractor.
6.4.2 Manufacturer. This term and the terms tank manufacturer and supplier
are used interchangeably to indicate the particular plant where the tank is
manufactured.
6.4.3 Acquistion activity.
This term refers to any acquisition activity.
6.4.4 Service life. Based upon past experience, it appears that the normal
tank service life is equivalent to that of the aircraft in which they are
installed.
6.4.5 Construction. This term means a specified combination of materials,
material arrangements, and manufacturing methods (mold/mandrel, joint designs~
and other necessary included techniques).
6.4.6 Approved construction. This term means a construction that has been
granted phase I preproduction test approval and consists of a specified
combination of materials, material arrangements, and manufacturing methods
(mold/mandrel, joint designs, and other necessary included techniques) that
have been successfully demonstrated during phase I preproduction tests.
6.5 Changes from previous issue. Asterisks are not used in this revision to
identify changes with respect to the previous issue due to the extensiveness of
the changes.
Custodians:
Preparing activity:
Air Force - 11
Army - AV
Navy - AS
Project No. 1560-0119
Air Force - 11
Review activities:
Air Force - 99, 80
User activities:
Army - ME
29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |