Click here to make tpub.com your Home Page

Page Title: Packaging
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-81333A(OS)
temperature and barometric pressure shall be simutaneously recoded and the internal air pressure corrected
for any change between the ambient temperature and barometric pressure at the end of the test and the ambient
temperature pressure at the beginning of the test and at intervals of not less than 8 hours for the duration thereof,
each external knob and and energent shaft shall be operated at least one turn in each direction or if restricted to less
than one turn, to the limit in each direction for at least one complete cycle.
4.5.5.4.1 Corrected and interpolated internal pressure. A check shall be made to determine that the corrected
final internal air pressure is not less than the interpolated internal air pressure computed on the basis of 1 psi
loss in 72 hours The interpolated air pressure shall be computed from the formula.
Where:
Pt=interpolated pressure in psi at time t
PO = Initial pressure in psi
e= Base of natural logarithrns
t = Times in hours between initial and final readings of internal air pressure in psi.
4.5.5.5 Static loading. The telescope shall be subjected to a static load test to determine that the instrument
will withstand static loading of 1,000 pounds per square inch in all directions.
5. PACKAGING
5.1 Preservation.
5.1.1 Level A.
5.1.1.1 Cleaning, drying, and preservative application. Not applicblele.
5.1.1.2 Unit packaging. Unit packaging of the telescope shall be in accordance wiht Method 11a of Specifica-
tion MIL-P-116. The container shall be in accordance with the drawings listed on LD258406.
5.1.2 Level C.
5.1.2.1 Cleaning, drying, and preservative application. Not applicable.
5.1.2.2 Unit packaging. Unit packaging of the telescope shall be in accordance with Method III of Specifica-
tion MiL-P-116. The container shall be in accordance with the drawings listed on LD258406.
5.2 Packing. No overpacking is required for Level A or Level C
5.3 Marking.
5.3.1 Special markings. None, unless otherwise specified in the contractor order (see 6.2.1).
5.3.2 Normal markings. in addition to the markings required by contract or waler., unit packages and shipping
containers shall be marked in accordance with the requirements of MIL-D-129, including serial numbers.