| ![]() MIL-T-81404B(AS)
representative of the contractor or laboratory, as applicable. Acceptance or
approval of material during the course of manufacture shall not be construed
as a guarantee of the acceptance of the finished product. Quality conformance
tests shall consist of the following:
a. Individual Tests (see 4.5.1)
b.
Sampling Tests (see 4.5.2)
Reliability Assurance Tests (see 4.5.3)
c.
d.
Special Tests (see 4.5.4)
Life Test (see 4.5.6)
e.
4.5.1 Individual tests. Each test set submitted for quality conformance
inspection shall be subjected to the individual tests. These tests shall be
adequate to determine compliance with the requirements of material,
workmanship. operational adequacy and reliability. As a minimum, each
test set accepted shall have passed the following tests:
a.
Examination of Product (see 4.5.1.1)
b.
Operational Test (see 4.5.1.2)
c.
Manufacturing Run-In Test (see 4.5.1.3)
4.5.1.1 Examination of product. Each test set shall be examined
carefully to determine that the material and workmanship requirements have
been met.
4.5.1.2 Operational test. Each test set shall be operated long enough to
permit the test set temperature to stabilize and to check sufficient
characteristics and record adequate data to assure specified operation of the
test set.
4.5.1.3 Manufacturing run-in test. Each test set shall be operated under
the conditions specified herein for a period of six hours without failure. A
failure shall be defined as anything which causes malfunctioning of the
test set. Only those adjustments will be permitted which can be made by using
controls and adjustments that are accessible to the operator during the normal
use of the test set.
Temperature
a.
Ambient room
b.
Humidity
Ambient room
Vibration
Any selected frequency within the
c.
range of 20 to 30 cps (excluding
resonant points) and a minimum
amplitude of
14
|