|
| MIL-T-81782C(AS)
TABLE IV
ACCEPTANCE TEST PLAN FOR COMPUTER TEST STATION
OJ-216( )/AWM-23(V)
1.0 TEST OBJECTIVE. To demonstrate self-test and operational
run-in tests of the Computer Test Station.
2.0 TEST CONDITIONS
a.
AWG-9 Slave Units
(1) 481451-1XX
b.
Utilities Required (Information only,
4.2.8)
(1} Power as specified in 3.2.2.1
(2) Clean air cooling as specified in 3.2.2.2
3.0 TESTS. In accordance with Acceptance Test Procedure 3282207,
a.
Perform self-test.
b.
Perform operational run-in tests.
-19-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |