|
| ![]() MIL-T-81783C(AS)
s. Verify RDR-IR/TV/EC ELEV meter operation.
t.
Verify two position PARAMP toggle switch operation.
u.
Verify two position AGC toggle switch operation.
v. Verify three position PD THRLD CLEAR potentiometer and switch
operation.
w.
Verify PD THRLD CLUTTER potentiometer and switch operation.
x.
Verify operation of PULSE GAIN potentiometer and switch.
Verify elapsed time indicator operation.
y.
z.
Verify operation of standard serial interface.
aa.
Verify SPL pushbutton switch operation.
bb.
Verify ALT DIF pushbutton switch operation.
Control, Sensor C-9037()/AWG-9. The C&D TS shall provide the
3.401.5
capability for performing the following tests on the sensor control assembly:
Verify proper operation of momentary double detent action switch
(HALF/FULL).
b.
Verify proper operation of MODE SELECT pushbutton switches.
c.
Verify ELEV potentiometer vernier control operation.
d.
Verify MRL momentary pushbutton switch operation.
e.
Verify OFFSET momentary pushbutton switch operation.
Verify three position WCS toggle switch.
f.
Verify three position IR/TV toggle switch.
g.
Verify LIGHT TEST pushbutton switch operation.
h.
i.
Verify PWR RESET pushbutton switch operation.
Verify jewel light power indication operation.
j.
(1) WCS
(2) IR/TV
(3) PWR RESET
-12-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |