| ||||||||||
| 
 
  | MILT81821 
3.5 Logistics 
3.5.1 Maintenance 
Trainer peculiar equipment and material repair parts in the estimated 
3.5.1.1 Repair parts. 
quantities required to support the trainers and related items for a period of six (6) months shall be 
provided and delivered concurrently with the training equipment and related items. Spare bulbs and 
fuzes equivalent to twenty-five (25%) percent of the total trainer requirements for each type shalI 
be furnished with each applicable trainer. A container for these spare buIbs and fuzes shall be 
mounted in a convenient location on the rear of each trainer panel and shall be appropriately 
labeled. Repair parts to be provided shall be specifically identified in the Detail Specification. 
Initial and follow-on conferences, as required to further define required 
3.5.2 Conferences. 
Contractor support and technically approve the configuration and design of the trainers and related 
items, and services specified in the Detail Specification, shall be convened as required. When 
specified in the Contract Data Requirements List DD Form 1423, specific agenda and minutes for 
these conferences shall be prepared in accordance with DID Nos. DIP6201 and DIP6202or 
as directed by the Procuring Activity. Technical data and administrative support, as required, shall 
be provided for each conference. Such conferences may include, but shall not necessarily be limited 
to the items listed in the following subparagraphs. 
3.5.2.1 Training equipment preliminary design review conferences. A preliminary design 
review conference shalI be convened for the purpose of reviewing the proposed Detail Specification 
or Detail Specification revision and other related data specified herein for the initial and subsequent 
procurements of training equipment, related items, and services required to provide the necessary 
training capability for the related series end items. The following items shall be provided for review 
by appropriate attendees on the convening date of the conference: 
a. 
A proposed Detail Specification or revision prepared in accordance with 
DID No. DIE6122. 
A proposed Make or Buy Program Plan prepared in accordance with 
b. 
DID No. DIA6100. 
A proposed detail Milestone Chart for the maintenance training 
c. 
equipment prepared in accordance with DID No. DIH6205. 
A preliminary MTE facilities report prepared in accordance with DID 
d. 
No. DIH6135. 
An MTE budgetary cost report prepared in accordance with DID No. 
e. 
DIF6125. 
53 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |