Page Title: Controls and control circuits
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MlLT81821
the location of the instrument in or on the trainer panel, the temperature recorded, and ambient
temperature for which the trainer panel was designed.
The trainer panels shall be tested to determine the
4.2.4.5.2 Controls and control circuits.
suitability of controls and control circuits for satisfactory mechanical and electrical operation.
4.2.4.5.3 Functional tests.
The functional tests shall consist of all tests necessary to
substantiate compliance with the trainer panel performance requirements and the system
operational interconnection capability, as stated in the Detail Specification.
4.2.4.5.4 Structural tests.
Structural tests shall be as required by the applicable
specifications cited in the Detail Specification.
4.2.4.5.5 Power tests.
Power tests shall be performed as necessary to demonstrate
compliance with the electrical, hydraulic, and pneumatic operational requirements of the Detail
Specification.
4.2.4.5.6 Environmental tests.
Environmental tests shall be performed in accordance with
appropriate portions of MlLSTD810 as necessary to establish durability and reliability of the
trainer panel materials and components under the environmental conditions of service operation.
4.3 Test Records.
The Contractor's records of al I inspection work and tests, giving the
results of tests required to determine compliance with the requirements and tests specified herein,
shall be kept complete and available to Government representatives throughout the life of the
contract. The record of report of inspection and tests shall be signed or approved by a responsible
person specifically assigned by the Contractor. Contractors not having laboratory test facilities
satisfactory to the Government shall engage the services of a commercial testing laboratory, capable
of conducting tests `and acceptable to the Government, to determine compliance with all the
requirements and tests in the applicable specifications cited herein.
4.4 Inventory.
E a c h trainer panel and related items specified in the Detail
Specification shall be inventoried by representatives of the Procuring Activity, QAR, and the Using
Activity as the last function of the final acceptance inspection.
4.5 Preparation for Delivery Inspection.
Preparation for delivery provisions shall be
examined for conformance to section 5 herein.
63