  | MlLT81821 
the location of the instrument in or on the trainer panel, the temperature recorded, and ambient 
temperature for which the trainer panel was designed. 
The trainer panels shall be tested to determine the 
4.2.4.5.2 Controls and control circuits. 
suitability of controls and control circuits for satisfactory mechanical and electrical operation. 
4.2.4.5.3 Functional tests. 
The functional tests shall consist of all tests necessary to 
substantiate compliance with the trainer panel performance requirements and the system 
operational interconnection capability, as stated in the Detail Specification. 
4.2.4.5.4 Structural tests. 
Structural tests shall be as required by the applicable 
specifications cited in the Detail Specification. 
4.2.4.5.5 Power tests. 
Power tests shall be performed as necessary to demonstrate 
compliance with the electrical, hydraulic, and pneumatic operational requirements of the Detail 
Specification. 
4.2.4.5.6 Environmental tests. 
Environmental tests shall be performed in accordance with 
appropriate portions of MlLSTD810 as necessary to establish durability and reliability of the 
trainer panel materials and components under the environmental conditions of service operation. 
4.3 Test Records. 
The Contractor's records of al I inspection work and tests, giving the 
results of tests required to determine compliance with the requirements and tests specified herein, 
shall be kept complete and available to Government representatives throughout the life of the 
contract. The record of report of inspection and tests shall be signed or approved by a responsible 
person specifically assigned by the Contractor. Contractors not having laboratory test facilities 
satisfactory to the Government shall engage the services of a commercial testing laboratory, capable 
of conducting tests `and acceptable to the Government, to determine compliance with all the 
requirements and tests in the applicable specifications cited herein. 
4.4 Inventory. 
E a c h trainer panel and related items specified in the Detail 
Specification shall be inventoried by representatives of the Procuring Activity, QAR, and the Using 
Activity as the last function of the final acceptance inspection. 
4.5 Preparation for Delivery Inspection. 
Preparation for delivery provisions shall be 
examined for conformance to section 5 herein. 