Click here to make tpub.com your Home Page

Page Title: Preparation for Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-82570A(OS)
4.5.4 Marine environment
4.5.4.1 Marine atmosphere environment test.  The torpedo tube assembly
shall be exposed at dockside or on the weather deck of a ship for 60 plus or
minus 5 days.  The access covers and muzzle covers shall be removed for a
period of 10 plus or minus 1 days.  The assembly shall be protected from
rain or snow by an appropriate shelter that will permit free circulation of
air.  At the completion of this test, there shall be no evidence of corrosion.
4.5.4.2 Alternative test for marine atmosphere.  Subject the torpedo tube
assembly to the Salt Fog test of MIL-STD-81O, Method 509, using a 20 percent
salt solution.  The solution shall be prepared by dissolving 20 plus or minus 2
parts by weight of salt in 80 parts by weight of distilled water.  The solu-
tion shall be adjusted to and maintained at a specific gravity between 1.126
and 1.157.  At the completion of this test there shall be no evidence of
corrosion.
4.5.5 During and after performance of the above environmental tests, no
damage shall occur which could affect proper operation or function of the
tube.
4.5.6 At the completion of the above environmental tests, the torpedo tube
shall meet all the quality conformance tests of 4.4.
PREPARATION FOR DELIVERY
5.
5.1  Preservation and packaging.  Preservation and packaging shall be
Level A or C, as specified (see 6.2).
5.1.1 Level A
5.1.1.1 Cleaning.  Unless otherwise specified, the torpedo tube, in the
nonoperating condition, shall be cleaned in accordance with Method C-1 of
MIL-P-116.
5.1.1.2 Drying,  Unless otherwise specified, the torpedo tube shall be
dried in accordance with one or more of the procedures of MIL-P-116, as
appropriate.
5.1.1.3 Preservation.  Immediately after cleaning and drying the torpedo
tube, the external unpainted metal surfaces which are subject to corrosion
shall be preserved by the application of preservative compound conforming
to the requirements of MIL-C-16173, Grade 2.
Not applicable.
5.1.1.4 Unit packaging.
Not applicable.
5.1.2 Level B.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business