4.3.5 Failure during test. Characteristics exhibited by the trailer
during any of the tests specified herein that would cause the trailer to fail
any of the requirements specified herein while in service shall constitute
failure of the unit to pass the test and shall be the basis for rejection.
4.4
First Article Inspection.
4.4.1 Test sample. One trailer shall be subjected to the first article
tests specified in 4.4.4.
*
4.4.2 Test report. Upon completion of the first article tests, a first
article test report in accordance with MIL-STD-831 shall be prepared and three
copies of the report furnished to the procuring activity.
*
4.4.2.1 Reliability and maintainability information. The following infor-
mation shall be submitted as a separate attachment accompanying the first
article test report (same quantity and quality of copies) or shall be included
as part of that report:
a. All failures, maintenance, and other events recorded shall be identi-
fied by accumulating operating time, miles, cycles, or position in the test
procedure as appropriate. Test conditions during failures and irregular
operations shall be recorded.
b. A summary of the engineering analysis and of any tests conducted to
determine assignable causes for any failures and irregular operations.
c. A summary of the engineering analysis behind any corrections made, to
be made on production units, or proposed to be made and behind the predicted
effectiveness of those corrections.
d. Clock time and manhours required for each maintenance and servicing
action during the tests. A brief description of the qualification and
experience of the personnel involved shall be included and shall be adequate
to allow comparison to the personnel anticipated in similar field work.
* 4.4.3 First Article test sample for the procuring activity. After sub-
mission of the first article test report, the contractor shall retain the pre-
production test sample at his plant in operating condition pending the follow-
ing actions by the procuring activity:
a.
Review of the mechanical construction
h. Performance of any test, included in the specification, after
reviewing the contractor's test report.
c.
Notification of final acceptance.
* 4.4.4 First Article tests. The first article tests shall consist of all
the tests described under 4.6, conducted in the same order.
The quality conformance tests shall con-
Quality conformance tests.
4.5
sist of the following:
4
|