|
| ![]() MIL-T-85031B(AS)
APPENDIX
Detailed functional requirements for Test Set,
TABLE II.
Guided Weapon AN/DSM-96B (Cont'd).
.
c.
Consecutive Operations to Check Fin Torque GO/NO-GO Circuits
Set-Up Procedure
Step
12.
When the weapon test drawer is in phase 2 of figure 4, repeat steps
5 through 8 for test 2A of group A torque values in table II d.
When in phase 7, repeat steps 4 through 8 for test 4A in table II
13.
d.
When in phase 9, repeat steps 4 through 8 for test 6A in table II
14.
d.
Perform steps 11-C, 12, 14, 15, 16, 8, and 9 in table II b.
15.
Repeat step 4 for test 2B of group A torque values in table II d.
16.
Repeat steps 11 through 14 for tests 2B, 4B, and 6B in table II d.
17.
18.
Repeat steps 15 through 17 for 3A (phase 3), 5A (phase 8), 7A
(phase 13, 3B, 5B, and 7B in table II d.
19.
Repeat steps 3 through 18 in accordance with group B torque values
in table II d, using A33 plug-in.
Repeat steps 3 through 18 in accordance with LSW torque values in
20.
table II d, using A34 plug-in.
21.
Repeat steps 3 through 18 in accordance with DL A torque values in
table II d, using A35 plug-in.
Repeat steps 3 through 18 in accordance with DL B torque values in
22.
table 11 d, using A36 plug-in.
23.
Repeat steps 3 through 18 in accordance with DL C torque values in
table II d, using A37 plug-in.
Depress ON/OFF switch on weapon test drawer. All lights on weapon
24.
test drawer, except OFF of READY-OFF, should go off.
All lights on console should go
25.
Set MASTER POWER switch S1 to OFF.
off.
36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |