|
| MIL-U-17293D(SH)
previously acquired or tested by the Government, and that bidders offering
such products, who wish to rely on such production or test) must furnish
evidence with the bid that prior Government approval is presently appropriate
for the pending contract.
6.4 On board repair parts. When specified (see 6.2.1), on board repair
parts for electric motors shall be furnished in accordance with the applicable
motor specification specified herein.
6.5 Sub-contracted material and parts. The preparation for delivery
requirements of referenced documents listed in section 2 do not apply when
material and parts are acquired by the contractor for incorporation into the
equipment and lose their separate identity when the equipment is shipped.
6.6 Changes from previous issue. Asterisks are not used in this
revision to identify changes with respect to the previous issue, due to the
extensiveness of the changes.
Preparing activity:
Navy - SH
(Project 4520-N268)
15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |