|
| MIL-V-17360E
first article inspection to those bidders offering a product which has been
previously acquired or tested by the Government, and that bidders offering such
products, who wish to rely on such production or test, must furnish evidence with
the bid that prior Government approval is presently appropriate for the pending
contract.
6.4 Sub-contracted material and parts. The packaging requirements of
referenced documents listed in section 2 do not apply when material and parts
are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
6.5 Supersession data. This specification includes the requirements of
MIL-V-17360D dated 2 July 1963 (see table II).
TABLE II.
Supersession data.
MIL-V-17360E
MIL-V-17360D
I
I
Class B
Class B
Class C
Class C
Class A
Subject term (key word) listing.
6.6
Cylinder, carbon dioxide
Pressure seated
Valve, manual operation
Valve, piston operated
6.7 Changes from previous issue. Asterisks are not used in this revision
to identify changes with respect to the previous issue due to the extensiveness
of the changes.
Preparing activity:
Custodians:
Navy - SH
Army - ME
Navy - SH
(Project 4210-0375)
Air Force - 99
Review activities:
Army - CE
Navy - YD
Air Force - 84
DLA - Cs
User activity:
Navy - MC
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |