|
| MIL-V-24694(SR)
6.4 Subcontracted material and parts. The packaging requirements of
referenced documents listed In section 2 do not apply when material and parts
are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
6.5 Subject term (key word) listing
Cartridge type
Qualification
Threaded
Valves
Preparing activity:
Navy - SH
(Project 481O-NO57)
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |