Click here to make tpub.com your Home Page

Page Title: Contractor's quality control system
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-V-62008B(AT)
Table VI. Maximum acceptable noise levels for Army Materiel
Command equipment (continuous noise)
Octave band
Center frequency
Maximum acceptable noise level
(Hz)
(db ref. 0.0002 microbrar)
63
121
125
111
250
103
500
102
1000
100
2000
100
4000
100
8000
100
3.12 Workmanship. Workmanship shall be of a quality to assure that vehicle and
components are free from defects resulting from improper manufacturing or assembly practices and
shall conform to requirements herein specified.
3.13 Recycled, virgin and reclaimed materials. The use of recycled materials which meet the
requirements of the applicable item or part without jeopardizing its intended use shall be encouraged.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase
order, the contractor is responsible for the performance of all inspection requirements as specified
herein. Except as otherwise specified in the contract or purchase order, the contractor may use his
own or any other facilities suitable for the performance of the inspection requirements specified
herein, unless disapproved by the Government. The Government reserves the right to perform any of
the inspections set forth in the specification where such inspections are deemed necessary to assure
supplies and services conform to prescribed requirements.
4.1.1 Contractor's quality control system. Unless otherwise specified by the acquisition
activity, the contractor shall provide and maintain an effective Inspection and quality Control System
acceptable to the Government covering the supplies under the contract. A current written description
of the system shall be submitted by the contracting officer prior to initiation of production. The
contractor will not be restricted to the inspection station or to the method of inspection listed
provided that an equivalent control is included in the approved quality control procedure. The
contractor shall notify the Government of and obtain approval for any change to the written
procedure that might affect the degree of control required by this specification or other applicable
documents referenced herein.
4.1.2 Government verification. All quality assurance operations performed by the contractor
shall be subject to Government verification at unscheduled intervals. Verification shall consist of
(a) surveillance of the operations to determine that practices, methods, and procedures of the written
22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business