|
| ![]() MIL-V-81995(AS)
Table of Contents (Continued)
Page
Title
Sect ion
18
Changes in the parts list
3.11.3.3
18
Changes in vendors
3.11.3.4
18
Responsibility for changes
3.11.3.5
18
QUALITY ASSURANCE PROVISIONS
4
18
Classification of tests
4.1
19
Responsibility for inspection
4.1.1
19
Qualification
4.2
19
Qualification test samples
4.2.1
21
Qualification testing
4.2.2
21
Retention
4.2.2.1
21
Sampling tests
4.2.3
Rejection and retest of qualification and
4.2.4
22
sampling tests samples
22
Disassembly and inspection
4.2.5
22
Test report
4.2.6
22
Individual inspection
4.3
23
Rejection and retest of units submitted for acceptance
4.3.1
23
Test conditions
4.4
23
Test apparatus
4.4.1
23
23
Temperature
4.4.1.2
23
Pressure
4.4.1.3
23
Instrumentation
4.4.2
23
Tests
4.5
23
Calibration
4.5.1
24
Cycling and endurance
4.5.2
25
Opening-closing time
4.5.3
25
Leakage
4*5.4
25
Proof pressure
4.5.5
25
Vibration
4.5.6
25
Method
4.5.6.1
25
Procedure
4.5.6.2
25
Test installation
4.5.6.2.1
26
Frequency scan
4.5.6.2.2
26
Resonance endurance tests
4.5.6.2.3
27
Cycling endurance test
4.5,6.2.4
27
Recalibration
4.5.7
27
Teardown and inspection
4.5.8
27
Dust
4.5.9
27
Part I, Nonoperating
4.5.9.1
27
4.5.9.2
Part II, Operating
27
4.5.10
Rain
37
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |