MIL-W-15805F(SHIPS)
Requirement
Test
paragraph
paragraph
Test
Group C (cont'd)
Size
3.4.2.2; 3.4.5.1;
3.4.6.l and figure 2
Mounting
3.4.1.1
4.5.5 and
MIL-I-983
Salt spray (not required for transmitter
and crosswind and headwind equipment )
3.3.1
MIL-I-983
3.3.1
MIL-I-983
Vibration (vital)
Shock (not required for recorder)
3.3.1
MIL-I-983
Accuracy (third part)
3.3.2; 3.4.2.1; and
4.5.2.3 and
3.4.5.2
4.5.4
A start .and stop condition that will duplicate actual in-service operation shall be introduced for
this phase of the test. A minimum of twenty "start-stops" at the end of each hour's test is re-
quired. The deenergized period shall be of sufficient duration so as to permit the equipment
under test to come to a complete rest. The rest period shall not exceed 30 seconds.
4.5 Test procedures. -
(2) Rotate speed shaft counterclockwise
by hand, and check direction of indi-
4.5.1 Operating test. - The operating test shall
cator.
resist of the following for the individual components:
(3) Adjust each brush to bear on contact
slip ring with a force of 15 to 20
grams.
4.5. 1.1 Final inspection procedure for wind
direction and speed transmitter (detector). - Final
4.5. 1.2 Final inspection procedure for wind
inspection procedure for wind direction and speed
direction and speed master transmitter (transmit-
transmitter (detector) shall be as follows:
ter). - Final inspect ion procedure for wind direc-
tion and speed master transmitter (transmitter)
(a) General examination in accordance with
shall be as follows:
MIL-I-983 and as follows: Visual exami-
nation of unit, covering finish, identifi-
(a) Assembled case with terminal strips,
cat ion plate , installation of lockwashers,
receptacles and wiring.
and similar items.
(1) General examination in accordance
(b) Dielectric strength in accordance with
with MIL-I-983 as follows: Visual
MIL-I-983 and as follows: Test with Hi-
examination of case assembly
Pot (set at 900 volts) with one lead con-
covering finish, installation of
nected to support assembly, and other
Iockwashers, soldered connections,
lead connected successively to each prong
and similar items.
of connector for 5 seconds.
(2) Continuity: With Simpson meter
(c) Insulation resistance in accordance with
(scale (RX1) check for continuity
MIL-I-983 and as follows: Connect one
between Winchester receptacles
lead of rnegger to support assembly and
and terminal strips.
other lead to each prong of connector.
(3) Dielectric strength in accordance
The resistance shall be not less than 10
with MIL-I-983.
megohms at 500 v.d.c.
a. Position Hi-Pot test plug to a
(d) Direction of rotation and electrical zero
Winchester receptacle. Set
position shall be conducted as follows:
Hi-Pot to 900 volts and con-
(1) Install transmitter on test standard
nect one lead to test plug and
and connect to test indicator.
other lead to spacing collar
Position vane to North position and
of Winchester receptacle.
check test indicator to within plus
b. Test for 5 seconds and then
or minus 1-1/2 degrees. Move to
repeat on other connector.
each cardinal point and check direc-
(4) Insulation resistance in accordance
tion of rotation and accuracy.
with MIL-I-983.
Frictional torque 4.0 inch-ounce
(direction) and 0.056 inch-ounce
(speed) shall be verified.