|
| ![]() MIL-W-48299 (AR)
4.4 Quality
Conformance
Inspection
4.4.1 Inspection Lot Formation.- Inspection lots shall
comply with the lot formation provisions of MIL-A-48078. In
addition, inspection lots of warheads shall contain:
a.
M-9 flake propellant from not more than one lot from
one manufacturer.
b.
Fuzes from not more than one lot from one manufacturer.
c.
Metal parts from not more than two lots with the same
interfix number from one manufacturer.
4.4.2 Examination.- See MIL-A-48078
Sampling Plans. - Unless otherwise specified in the
Classification of Defects and Test Tables, sampling plans for
major and minor defects shall be in accordance with MIL-STD-105,
inspection Level II.
12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |