| MIL-W-48347 (PA)
None defined.
4.4.3 Testing.
4.4.4 Inspection Equipment. The inspection equipment
required to perform the examinations and tests prescribed
herein is described in the "Paragraph Reference/Inspection
Method" column in the tables starting with paragraph 4.4.2.1.
The contractor shall submit for approval inspection equipment
designs in accordance with the terms of the contract. See
Section 6 of MIL-A-48078 (PA).
4.5 Test Methods and Procedures
None defined.
PREPARATION FOR DELIVERY
5.
5.1 Packaging, Level C. Package in accordance with
Picatinny Arsenal dwg. no. 8837835.
5.2 Packing and Marking. Packing and marking shall be
in accordance with Picatinny Arsenal dwg. no. 8837835.
NOTES
6.
6.1 Intended Use. The warhead covered by this
specification is intended for use on the 2.75 Inch Rocket
System.
See MIL-A-48078 (PA).
6.2 Ordering Data.
6.3 Submission of Designs for Approval. See 6.2.3 of
MIL-A-48078. Submit equipment designs, as required to:
Commander
Picatinny Arsenal
ATTN: SARPA-QA-A-R
Dover, New Jersey 07801
6.4 Definitions.
6.4.1 Contractor. Unless otherwise specified, the word
"contractor" used throughout. this specification, shall mean
any supplier or producer of items or material to the Government.
This shall include commercial contractors, sub-contractors,
Government-Owned, Contractor-Operated, (GOCO) and Government-
Owned, Government-Operated (GOGO) plants.
Preparing Activity:
Custodian:
Army-PA
Army-PA
1340-A424.
Project Number:
8
|