MIL-W-50550A (MU)
6.3.4  Contractor Designs,-Contractor designs are designs of
inspection equipment for which the Government has assigned design
responsibility to the contractor.  Contractor designs shall be
supported by detailed designs which depict all information
necessary to completely fabricate, calibrate and operate an item of
inspection equipment.  This requires that the necessary views,
dimensions, materials, finish, notes, operating and calibration
instructions be properly depicted in accordance with approved
practices to the extent that further calculation or clarification
will not be required.  Unless otherwise specified, contractor
designs may be developed on the format the contractor normally
employs in his equipment design procedure provided such format
reflects the detail and information specified above, subject to
the following controls:  All submitted contractor designs shall
conform to MIL-D-1000. Category A, Form 2.  Legibility and repro-
ducibility shall permit conventional making of clearly under-
standable, high contrast reproductions.  Contractors shall submit three
copies of final designs as a flat set.  Designs shall be submitted
for approval as specified in 6.3.5.
6.3.5  Submission of Contractor Designs. -All submitted designs
shall contain a reference to the applicable five digit code
number contained in Section 4 of this specification and the
appropriate component or assembly drawing number and revision
letter to which the specific design applies.  Unless otherwise
specified on the EL, all designs of equipment for inspection of
defects classified as critical and major shall be submitted for
approval to the Commanding Officer, Picatinny Arsenal, ATTN:
SMUPA-QA-A-R.  All other designs of Inspection equipment shall be
approved by the inspection element of the agency administering
the contract; submission shall be as directed by tile contracting
officer.  Partial submission of Inspection equipment designs is
permissible and encouraged.  However, the Arsenal completion date
for design review will be based on the date of the final submission
of designs.  Picatinny Arsenal design review will be accomplished
normally within one month after receipt.
6.4 Submission of First Article Samples .-Instructions as
to the location for the evaluation of the First Article sample
shall be obtained from the contracting officer.  Upon receipt of
such request, the contracting officer shall advise Picatinny
Arsenal and instruction will be issued accordingly  All inquiries
should be forwarded to:  Commanding Officer, Picatinny Arsenal,
ATTN: SMUPA-QA- A-I.