6.3.1  Inspection Equipment Lists. - Inspection equipment
lists indicate the availability of Inspection equipment designs
by showing in the "number " column of' the list of inspection equip-
ment (Form SMUPA 1010) the numbers of drawings or Federal Stock
numbers of existing equipment designs, or codes as indicated in
paragraph 6.3.2.  Design action required of the contractor is de-
scribed in paragraphs 6.3,3 and 6.3.4. The contractor will be re-
quired to prepare detailed drawings in accordance with 6.3.4 for
all the equipment coded as "Contractor Design" in the number
column.  These contractor designs must be approved by the Govern-
ment prior to fabrication or procuring of the equipment.  Designs
shall be submitted for approval as specified in 6.3.5.
6.3.2  Inspection Equipment List Codes. - The inspection
equipment as defined In 6.3.3 and 6.3.4 will be designated in the
EL by the following codes:
CD - Contractor design on controlled contractor format and/or
commercial equipment.
MU - Army design, mandatory for use.
6.3.3  Army Designs. - rmy designs are reflected on detailed
drawings which completely depict all the information necessary for
the fabrication of the item of Inspection equipment.  The contractor
need provide no design when an Army design is listed for an item
of inspection equipment.  Army designs fall into two basic classi-
fications; mandatory (designated "MU") and non-mandatory (indicated
by drawing or Federal Stock Number).  When an inspection equipment
list references mandatory Army designs, the contractor shall com-
ply with, and use these designs accordingly.  The contractor may,
however, in connection with non-nandatory designs, and with the
approval of the Government, design alternate inspection equipment
or use comparable commercial equipment to facilitate his operations.
Such contractor prepared designs or commercial equipment selections
must be approved by the Government prior to fabrication or pro-
curing of the equipment.  Designs shall be submitted for approval
as specified in 6.3.5.
6.3.4  Contractor Designs. - Contractor designs are designs
of inspection equipment for which the Government has assigned de-
sign responsibility to the contractor.  Contractor designs shall
be supported by detailed drawings which depict all information
necessary to completely fabricate, calibrate and operate an item
of inspection equipment.  This requires that the necessary views,
dimensions, materials, finish, notes, operating and calibration
Instructions be properly depicted in accordance with approved prac-
tices to the extent that further calculation or clarification will
not be required.  Unless otherwise specified, contractor designs
may be developed on the format the contractor narmally employs in
his equipment design procedure provided such format reflects the
11