Click here to make tpub.com your Home Page

Page Title: Preparation for Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-W-60425 (MU)
4.3.3
Testing
4.3.3.1  Weight of charge (see dwg. 9221050) - Major defect -
Code No. 02007. - This determination shall be performed on a sample
of 200 units for the first production lot. The determination shall
be performed on a sample of 50 units from each subsequent lot.
The average weight of 25 empty units shall be used as the basis
for charge weight determination. Under sampling, if three (3)
or more units fail to meet the requirement, the lot shall be rejected.
4.3.4  Inspection Equipment - Equipment Tabulation Number
ET-9221050 identifies the inspection equipment required to
perform the examinations and tests prescribed in this section.
The contractor shall design inspection equipment in accordance
with the instructions in paragraph 6.3.
4.3.4.1  Government rights to documentation. - Inspection
equipment drawings and lists provided and revised in accordance
with the requirements of the ET may be used by DOD activities
for design, procurement, manufacture, testing, evaluation,
production and receiving inspection, overhaul, shipping, storage,
identification of stock, ordering and storage of replacement
parts, inspection of items at overhaul, general maintenance of
equipment, construction, survey and whenever inspection equipment
drawings are needed.
4.3.4.2  Supply and maintenance. - Supply and maintenance of
the equipment listed on the ET shall be In accordance with
Specification MIL-I-45607.
4.3.4.3  Government use of contractor's inspection equipment.
The contractor shall make available to the Government all
inspection equipment necessary for determining conformance with
contract requirements. Personnel for operating the equipment
and verification of its accuracy shall be supplied by the
contractor for the performance of examination or test by the
Government.
Preparation for Delivery
5.
5.1
Packaging. - Level A
5.1.1  Warheads. - Packaging shall be in accordance with
drawing 8886811.
5.2
Packing. - Level A
5.2.l
Warheads. - Packing shall be in accordance with drawing
8886810.
5.2.2 Rocket Motors and Warheads shall be packed in accordance
with drawing 9209570.
9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business