|
| ![]() MIL-W-63468A (AR)
AMENDMENT 5
PAGE 11
4.4.2.3:
Delete and substitute:
Major 109:
--
"109
Leakage test
6
3.16
4.5.6
Ballistic test
4.5.8".
3.18
110
36(a)
--
Add Note (a) :
" (a)
Sample includes 6 items from leakage
test. "
Add 4.4.2.4, included as Page 11a.
4.5.1, second sentence:
Delete and substitute:
"Verify that all major components, assemblies, and
subassemblies, such as pusher plate, M73 Grenade, flat flex
lead, lead tape, auto jettison retaining rings, etc., are
present and properly placed; that all grenades are safe; and
that no foreign material is present."
4.5.2, second sentence: Delete "2.75 Inch Rocket Motors" and
substitute "2.75 inch MK66 rocket motors".
PAGE 12
4.5.2:
Delete "MIS-30862" and substitute "MIL-R-71163".
PAGE 14
4.5.2, last paragraph, line 3: Delete "intact and securely in
place)." and substitute "intact and not manually removable)."
4.5.3:
Delete "MIS-30862" and substitute "MIL-R-71163".
PAGE 16
4.5.5:
Delete "MIS-30862" and substitute "MIL-R-71163".
Delete "for first article testing only.".
4.5.6, second line:
End of paragraph, Add: "To inspect the cargo compartment,
unthread the plug in the rear of the warhead. If one or more
warheads fail to meet the requirements, the lot shall be
rejected."
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |