|
| MIL-W-70467 (AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting Office for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the following items in sample quantities as
indicated:
Part Description
Drawing
Quantity
Pin, Firing
9370238
15
End Cap, S&A Housing
9370239
15 or 5/cavity
whichever is greater
Cap, Nose
9370240
15
Cap, End
9370241
15 or 5/cavity
whichever is greater
Disc, Barrier
9370242
25
Pad , Felt
9370243
15
Retainer
9370244
15
Plug
9370245
15
Housing, Smoke and S&A
9370246
15 or 5/cavity
whichever is greater
Body, Warhead
9370249
15
Device, Safety and Arming
9215619-1
25
Device, Safety and Arming
9215617-1
10
(Detonator only)
Device, Safety and Arming
9215617-1
75
Rotor Housing Assembly
8883719
10
Spring, Detent
8883713
10
Spring, Setback Weight
8883718
10
Gear and Pinion Assy No. 1
8883703
25
Gear and Pinion Assy No. 2
8883700
25
Escapement Gear and Pinion
8883710
25
Assembly
Lever Assembly
8883706
30
Rotor Assembly
8883744
20
Inner Plate Assembly
9260804
20
Escapement and Gear Assembly
8883692
20
Smoke Cartridge Assembly
9370252
30
Warhead, XM274
9370251
96
4.3.2 Ins pections to be performed.
See MIL-A-48078 and Table I
specified herein.
4.3.3 Rejection.
See MIL-A-48078 and Table I specified herein.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |