|
| MIL-W-70467 (AR)
NOTE: When there is automatic detection and automatic rejection of
defective items to a controlled area or a controlled rejection of
defective items, it is permissible for the defect standards to be
identifiable and their introduction into production noticeable to
contractor inspection personnel.
4.4.5.2 Undetected defect standards. Provisions shall be
established for the corrective action to be taken where the
equipment or contractor inspection personnel fail to identify a
standard as defective. These provisions shall include a
reinspection of all acceptable material subsequent to the last
acceptable verification check as a minimum.
4.5 Methods of inspection.
PRECAUTION: This specification covers sampling and testing of
chemical, toxic, or explosive materials which are potentially
hazardous to personnel. Accordingly, it is emphasized that all
applicable safety rules, regulations, and procedures must be
followed in handling and processing these materials.
Compliance with
4.5.1 Materials, components and processes.
all requirements of Section 3 of this specification shall be
ascertained by current and continuing examination of inspection and
test data to determine that all components (parts, subassemblies,
and materials) have been inspected and tested and found to comply
with their respective drawing and specification requirements, and
that all specified manufacturing processes have been followed.
4.5.1.1 Visual and mechanical inspection. The visual, manual,
and mechanical inspections and tests shall verify compliance with
the requirements of Sections 3 and 5 of this specification in
accordance with 4.4.2 herein and Table I.
If the total
4.5.2 Check test for deterioration of primers.
time between original acceptance of any primer lot and the assembly
of that lot into the S&A's exceeds two years, at any time since
previous tests, the primer lot shall be subjected to and must
satisfactorily pass the functioning and output tests specified in
MIL-P-48077 immediately before the primer lot is assembled into the
S&A's. This test shall be performed by the contractor on primers
selected by the Government Inspector at the facility assembling the
primers into the rotors. The test shall be conductd at Government
expense without cost to the contractor who loaded the primers or the
contractor who assembled the primers into the S&A's. The test shall
40
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |