Click here to make tpub.com your Home Page

Page Title: Table II. Sweep test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-W-70467 (AR)
TABLE II.
Sweep test
Direction of Excitation
Vertical
Launcher Condition
Transverse
Axial
(G)
(G)
(G)
FULL
4.3
5.8
3.1
NOTE :
The sweep time shall be 1 octave per minute 5 to 100 to 5 Hz.
4.5.10  Forty foot drop test.  Five warheads shall be subjected
to the forty foot drop test as specified in MIL-STD-331, Test 103.1,
Procedure 1 (substitute warhead for fuze) for first article testing
only.  The warheads shall be packed and packaged in accordance with
5.1 except that dummy 2.75 Inch Rocket Motors shall be substituted.
One test round shall be packaged with three dummy rounds in each
box.  The first article shall be rejected if one or more warheads
function or are found to be unsafe for disposal as a result of the
effects of the forty foot drop test.
4.5.11 Sealing test.  The smoke cartridge assembly shall be
tested in a water tank equipped for observation under vacuum.  The
water temperature shall be 65F minimum to 75F maximum.  The
water tank shall be equipped so that the smoke cartridge assembly
must be raised above the water level while still under vacuum before
releasing the vacuum and removing the smoke cartridge assembly.
49

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business