Click here to make tpub.com your Home Page

Page Title: Special Test Schedule
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-W-85057(AS)
b.
Failure Analysis Reports
c. Failure Analysis and Corrective Action Details and Summaries
d.
Reliability Test Reports
Corrective actions shall be Implemented subject to approval by the
cognizant Navy office.  All failures shall be classified in accordance
with MIL-STD-2074.
4.3.2.4 Failure Report - In the event of a failure the Government
inspector shall be notified immediately.  A report shall be submitted to
. the procuring activity upon completion of test.  In this report, the
contractor shall propose suitable and adequate design or material
corrections for all failures which occurred.  The procuring activity
will review the failure reports and corrective actions and determine
whether they are acceptable.
4.4 System Performance Demonstration Tests - Each WDC submitted for
acceptance will be functionally tested, in accordance with MIL-A-85055,
when integrated with the associated ARBS equipment.  The functional tests
will consist of demonstration of an approved functional test program or
factory test program.
4.5 Special Tests - Special tests shall be conducted for the purpose
of checking the effect of any design or material change on the performance
of the equipment and to assure adequate quality control.
4.5.1 Special Test Schedule - Selection of equipments for special tests
shall be made as follows:
(1) On an early equipment after an engineering or material change.
(2) Whenever failure reports or other information indicate that
additional tests are required.  (This will be determined by
the procuring activity.
4.5.2 Scope of Tests - Special tests shall consist of such tests as
approved by the procuring activity.  Test procedures previously approved
for the preproduction tests shall be used where applicable. When not
applicable, the contractor shall prepare a test procedure and submit it
to the procuring activity for approval prior to conducting the tests.
4.6 Test Procedures - The procedures used for conducting preproduction
tests, acceptance tests and life tests shall be prepared by the contractor
.
and submitted to the procuring activity for review and approval.  The right
is reserved by the procuring activity or the Government inspector to modify
the tests or require any additional tests deemed necessary to determine
compliance with the requirements of this specification or the contract.