Click here to make tpub.com your Home Page

Page Title: Maintenance Provisions and Field Testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-81959(AS)
Time Totalizinq Meter - The equipment shall have a time
3.3.3
totalizing meter in accordance with MIL-STD-454, Req. 57.
Cables and Connectors - The equipment shall provide for
3.3.4
the use of cables and connectors In accordance with MIL-T-21200.
3.3.6  Wiring (Internal) -
Internal wiring shall be in accordance
with the requirements o
Wiring
- External wiring shall be in accordance
3.3.6
with the requirements of
lnterchangeability - The equipment shall meet the inter-
3.3.7
changeability requirements as defined in MIL-T-21200.
Interference Control - The generation of radio interference
3.3.8
by the equipment shall be controlled within the limits of MIL-STD-461 to
the extent described herein.
Tests required shall be as defined for Class 11 B equipment
3.3.8.?
by Table II of MIL-STD-461A except that electromagnetic and E-field emissions
shall not exceed the limits established by MIL-STD-461A for Class II B equip-
ment by more than 30 dB.
Maintenance Provisions and Field Testin  - Provisions for
3.3.9
maintenance snail be as specified in MIL-T-21200. Speci  c test points and
test facilities shall be provided to the greatest extent practicable for ease
of field testing and maintenance.
Nomenclature and Nameplates - Nomenclature assignment and
3.3.10
namplate approval for equipment identi fication shall be in accordance with
MIL-N-18307.
Standard Conditions - The following conditions shall be used
3.3.11
to establish normal performance characteristics under standard conditions and
for making laboratory bench tests:
Room ambient (30
Temperature
Normal ground
Altitude
None
Vibration
Room ambient
Humidity
VAC (line to neutral), 3 Phase,
Input power
Hz
voltage
Service Conditions - The equipment shall operate satisfactorily
3.3.12
under any of the environment service conditions or reasonable combination of
these conditions as specified in MIL-T-21200 for Class 2 equipment, except as
modified herein.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business