Click here to make tpub.com your Home Page

Page Title: Submission of inspection equipment designs for approval.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-63993A(AR)
6.2 Ordering data.
Procurement documents shall specify the
following:
a.
Title, number and date of this specification.
b.
Provisions of submission of first article samples.
c.
Quantity required and delivery schedules.
d.  Certificates of conformance for each lot or shipment of
product.
6.3 Submission of inspection equipment designs for app roval.
(See 4.4.4).  Submit equipment designs (DI-E-1118/DI-R-1714) as
required to Commander: U.S. Army Armament Research, Development
and Engineering Center, ATTN:  AMSMC-QAT-I, Picatinny Arsenal, New
Jersey  07806-5000.  This address will be specified on the
Contract Data Requirements List, DD Form 1423 in the contract.
Unless otherwise specified, data item DI-R-1714 will apply.
6.4 Distribution of inspection failures and analysis data
reports.  Distribution of inspection failures and analysis data
reports shall include the following:  Commander,  U.S. Army
Armament Research, Development and Engineering Center, ATTN:
AMSMC-QAT-M, Picatinny Arsenal, New Jersey 07806-5000.
6.5 Drawings.  Drawings listed in Section 2 of this
specification under the heading US Army Armament Research,
Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as, Edgewood Arsenal,
Frankford Arsenal, Rock Island Arsenal (ARRADCOM), or Picatinny
Arsenal drawings.  Technical data originally prepared by these
activities is now under the cognizance of ARDEC.
6.6 Subject term (key word) listing.
Thick film resistor
Resistor network
Trimmable resistor network
6.7 Changes from previous issue.  Asterisks (or vertical
lines) are not used in this revision to identify changes with
respect to the previous issue due to the extensiveness of the
changes.
Custodian:
Preparing activity:
Army-AR
Army-AR
(Project 1345-A529)
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business