Click here to make tpub.com your Home Page

Page Title: First production vehicle inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-62076B(AT)
other foreign matter. Weld penetration shall be such as to provide adequate transference of
maximum design stress through the base metal juncture. Fillet welds shall be provided when
necessary to reduce stress concentration.
3.8.5 Machined work. All parts shall be manufactured to gage through the use of proper
jigs and fixtures and shall provide interchangeability of parts as manufactured.
3.8.6 Castings. Castings shall be sound and free from patching, misplaced coring, warping,
or defects which might render the castings unsound for use.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor
is responsible for the performance of all inspection requirements as specified herein. Except as
otherwise specified in the contract, the contractor may use his own or any other facilities suitable
for the performance of the inspection requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of the inspections set forth in
the specification where such inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
4.2 Government verification. Quality assurance operations performed by the contractor
shall be subject to Government verification at unscheduled intervals. Verification shall consist
of observation of the operations to determine that practices, methods, and procedures of the
contractor's inspection are being properly applied. Failure of the contractor to promptly correct
product deficiencies discovered shall be cause for suspension of acceptance until correction has
been made or until conformance of product to specification criteria has been demonstrated.
4.3 First production vehicle inspection. The first production semitrailer chassis and
container procedure under the contract shall be inspected by the contractor at his plant under the
direction and in the presence of Government representatives. The purpose of the inspection shall
be to determine conformance to the requirements of the contract. Acceptance of the first
production semitrailer chassis and container shall not constitute a waiver by the Government of
its rights under the provisions of the contract.
4.3.1 Vehicle weight. The first production semitrailer chassis shall be weighed to
determine curb weight and distribution of curb weight on kingpin and axles. The imposed
loading on the kingpin and axles will be computed using curb weight, container weight, and
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business